SmartgridOne logo
SmartgridOne logo
Accessories
AppCertificates
Configuration from A to Z
Control response timeController
Customer Specific
Devices
Boiler
Cloud
Energy Meter
Ev Charging Station
Gas Meter
EnirisHager
Heat Pump
New integrations
Plc
Pv Hybrid And Battery Inverters
Switched Loads
Water Meter
External Signals
InstallationLicenseNetworkQuick StartSafety, maintenance and legal noticesSpecificationsStatus LEDs
Toolbox
Troubleshooting
Video tutorialsWiring & connectivity guidelines
DevicesGas Meter
Device TypeModbus TCP (Ethernet)RS485
HPS✅❌
TPCS-630
Note
Note

If you want to change the interval between measurements to avoid granularity issues you can go in Settings > Advanced Settings and modify :

  • Data reading period : How often the data is read out from the devices. You should set this to 0, which means as fast as possible.
  • Scheduler run period : How much seconds there must be at least between two consecutive control loop executions. Less excecutions mean less data usage, but come at the cost of slower and less accurate control.

Eniris

Previous Page

Heat Pump

Next Page